Mild, dry and foggy weather at Woody Bay today. As the signalling engineers Dick Gunn and Rob Pym worked on signal refurbishment and communications cablework programmes respectively, the main gang working on the track by the crossover were tasked with clearing away mud-contaminated ballast after last week's flood washouts, and digging and installing a new cross drain pipe. This should prevent a reoccurrance of the flooding over the track as a result of the torrential rain experienced recently.