Work in Progress - Thursday 4th December

Volunteers continued work in and outside the new toilet block today. Whilst some painting and more wiring was taking place in the volunteers building, outside the opportunity was taken to tidy up and level off around the building. A mini digger on-site was used to spread chippings around the base of the building over some installed drainage. Later the digger landscaped the area and loaded the surplus soil and stone into a works train positioned in the dock siding.

1. Heddon Hall with a bogie open wagon being loaded with spoil

2. The mini-digger loading the bogie open wagon in the loading dock siding

3. Toilet building with walls recently rendered and works train in loading dock siding