After the hectic and busy days earlier this week with AXE's dedication and the Armistice, the Thursday outdoor gang continued with the necessary enhancement work. With several contractors and volunteers now fitting out the toilet block, the regulars were tasked with the fitting of the wooden railings to the rail-built fence posts installed last week. Working in typical November Exmoor weather (rain and drizzle!), the gang used the smaller marquee as a movable shelter as they worked alongside the loading dock.
Jim Price, John Villers and Nigel Thompson work under cover as they fit the wooden fence alongside the access path to the toilet block.