1. The first job of the day was to put up the eight information panels - previously located inside the Tea Rooms - inside the marquee.
2. & 3. Next, two picnic tables were positioned outside near the Woodland Walk.
4. Meanwhile, work continued on greasing all the fishplates on the line.
5. & 6. After lunch, a trip was made by some of the volunteers to the site of this weeks Working Weekend north of Bratton Fleming. (Photos Graham Rust)
7. Two of our signalling engineers , Dick Gunn and Trevor Buck were busy today looking for some scrap lengths of steel for their next project. Behind them is PILTON - the rebuild almost complete.
Words and photos by Nigel Thompson except 5. & 6. by Graham Rust.