We are now in the depths of winter with snow and sleet forecast for today although this did not deter three volunteers travelling all the way from Dorset to continue the various projects underway at Woody Bay.
A five-man gang travelled in the works train to Killington Lane to complete the platform works required to accommodate the heritage coaches. The weather conditions were not good, with a biting wind and driving sleet giving us the incentive not to hang around.
The bed for the sleeper edges was excavated and cleaned, the sleepers placed and the voids backfilled. All that is now needed is for some tidying up and compacting of the platform surface for it all to be ready.