AXE operated a freight train this afternoon to test the vacuum brakes on the new wagons.
1. AXE shunts the recently painted ex South Africa wagons.
2. ISAAC with the service train looms over AXE as it passes alongside.
3. AXE with the assembled freight train in the loading dock siding.
4. Out on the main line - AXE tests the vacuum brakes of the new wagons.
Words and photos Nigel Thompson